The Tradition at Willbrook PlantationArchitectural Review BoardP.O. Box 1852, Pawleys Island, SC 29585 Permit Application for Construction/Alteration/Removal Projects (Revised December 2005 - printed from ARB website)
o Property Owner: __________________________________________________________ Phone:_______________ o Property Address: ______________________________________________________________Lot # ___________ o Mailing Address: _______________________________________________________________________________ o Fee/Deposits Attached:$ ___________$_______________$_____________________$___________________ o Contractor Name:: _________________________________________________S.C. License #:________________ o Contractor Worksheet Attached (if Req): ____________________________________________________________ o Project Description/Scope: ________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ _______________________________________________________________Proposed Start Date: _______________ Owner's Compliance Statement: This is to verify that the appearance and condition of my home and yard are and will remain in compliance with ARB Guidelines and Tradition Convenants and that I have read the back of this application. Owner's Signature: ____________________________________________________________Date: _________________ Contractor's Signature: ________________________________________________________ Date: _________________ Date Received by the ARB: _____________ Approved: _______ Denied: _________ Date: _____________ ARB Vote: #1 __________ #2 __________ #3 __________ #4 ____________ #5 ____________ #6 ____________ |
| |||||||||||||||||||||||||||||||||||||||||||||
|
+ Include Site Survey and Legal Plat to Scale with Application * Impact and Landscape Deposits: Portions of the Deposits may be refunded after completion of the project, Final Inspection, and Certificate of Occupancy is obtained from Georgetown County. These Deposits cover any damages to the The Tradition common areas from contractors, vendors, etc. during construction. Deposit refund amounts may vary according to the scope of the project, i.e., utilization of heavy equipment, including, but not limited to, trucks with more than two axles, track-driven equipment, front-end loaders, backhoes, concrete trucks, dumpsters, etc. Make three (3) checks; #1 for refund upon completion; #2 for non-refundable Review Fee; #3 for both Deposits. No plans will be accepted for review by the ARB until receipt of all Application Fees and Deposits "The purpose of the ARB is to preserve the original natural design concept at The Tradition at Willbrook Plantation, and to enhance and protect the property values. Approval or disapproval of an Application for modification or alteration to any residence or lot is at the sole discretion of the ARB, and may be based upon any grounds, including purely aesthetic considerations, which the ARB may deem appropriate. Decisions of the ARB may be appealed in writing to The Tradition Property Owners Association Board of Directors, whose decision shall be final and binding." The ARB will make every effort to assist owners and their architects and contractors in order to avoid construction problems by sharing experiences with designs, materials, colors, etc. Property owners are accountable for the actions of contractor (s) in observing all convenants and maintaining a neat, clean construction site, avoiding damage to trees and property, cooperating with The Tradition's managers, ARB, and security, not distrubing neighbors, and observing other acceptable construction phase conditions. Property owners are urged to refer to The Tradition at Willbrook Plantation Covenants & Restrictions, and the Architectural Review Board Guides. Property owners are urged to make sure they are protected by Builder's Risk Insurance, and to obtain a Certificate of Insurance from contractors(s) and sub-contractor(s) as proof of Public Liability and Workmen's Compensation Insurance. The Certificate should bear the name of owner as Certificate Holder. It is prudent to call the insurance company whose telephone number appears on the certificate to confirm that the policy is currently in force. No work shall begin without ARB approval; the ARB and Georgetown County issued building permits. Substantial fines and/or penalties will be imposed on the property owner, if work begins before the owner and/or contractor receives all required permits and approvals. Notifty ARB upon completion of work for Final Inspection, Signoff and refunds. Submit Application in Duplicate with all Documents, Samples & Drawings. etc. | |||||||||||||||||||||||||||||||||||||||||||||
| ARB Application 99.pub rev.35.5.99W |